{"id":163613,"date":"2025-12-17T16:19:43","date_gmt":"2025-12-17T16:19:43","guid":{"rendered":"https:\/\/www.pv-tech.org\/?p=163613"},"modified":"2025-12-17T16:19:46","modified_gmt":"2025-12-17T16:19:46","slug":"t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas","status":"publish","type":"post","link":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/","title":{"rendered":"T1 Energy begins construction at 2.1GW TOPCon cell manufacturing facility in Texas"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy-1024x682.jpg\" alt=\"A T1 Energy manufacturing facility.\" class=\"wp-image-163614\" srcset=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy-1024x682.jpg 1024w, https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy-300x200.jpg 300w, https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy-768x511.jpg 768w, https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg 1202w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">The G2 Austin facility is a US$400-425 million investment, at which T1 expects to begin commercial operation by the end of 2026. Image: T1 Energy.<\/figcaption><\/figure>\n\n\n\n<p>US solar manufacturer T1 Energy has started construction on the first phase of its cell manufacturing facility in Texas, which will add 2.1GW of cell manufacturing capacity to the US\u2019 growing cell production sector.<\/p>\n\n\n\n<p>The facility, G2 Austin, is a US$400-425 million investment, at which T1 expects to begin commercial operation by the end of 2026. T1 will produce tunnel oxide passivated contact (TOPCon) cells at the facility, and the company plans to expand the manufacturing capacity to 5.3GW through a second phase, and noted that this production figure \u201ccould be expanded if demand for cells increases\u201d.<\/p>\n\n\n\n<p>Cells will be used in the construction of modules at T1\u2019s G1 Dallas module manufacturing plant, <a href=\"https:\/\/www.pv-tech.org\/freyr-finalises-deal-to-acquire-trinas-us-solar-manufacturing-facility\/\" target=\"_blank\" rel=\"noreferrer noopener\">which the company acquired from Trina Solar last December<\/a> as part of its rebrand from Freyr Battery and its move from the battery sector to the solar manufacturing industry.<\/p>\n\n\n\n<p>The company has already seen significant demand for its modules\u2014<a href=\"https:\/\/www.pv-tech.org\/t1-energy-sold-725mw-of-modules-in-q3-2025\/\" target=\"_blank\" rel=\"noreferrer noopener\">selling 725MW of modules in the third quarter of this year<\/a>, driving sales volume of US$200-210 million\u2014and the addition of cell manufacturing will expand a production line that makes heavy use of US-based manufacturing.<\/p>\n\n\n\n<p>In August, <a href=\"https:\/\/www.pv-tech.org\/t1-energy-corning-landmark-us-made-solar-poly-wafer-cell-supply-deal\/\" target=\"_blank\" rel=\"noreferrer noopener\">T1 signed a supply deal with US ceramics and glass producer Corning<\/a> to acquire polysilicon and wafers from the company and its subsidiary, Hemlock Semiconductor, from a manufacturing facility in Michigan. Then, in October, <a href=\"https:\/\/www.pv-tech.org\/nextracker-supply-steel-module-frames-t1-energys-dallas-module-manufacturing-facility\/\" target=\"_blank\" rel=\"noreferrer noopener\">the company signed a deal to acquire steel module frames from US tracker manufacturer NEXTPower<\/a>, then known as Nextracker, for use in its modules. T1 chairman and CEO Dan Barcelo said today that both deals, and the production of cells at the G2 Austin facility, would help deliver an \u201cintegrated US polysilicon solar supply chain\u201d.<\/p>\n\n\n\n<p>\u201cSolar is the most scalable, reliable, and low-cost energy available today, and I look forward to the future of American solar running through Rockdale, Texas,\u201d added Barcelo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-building-a-domestic-supply-chain\">Building a domestic supply chain<\/h2>\n\n\n\n<p>The milestone is an important development for the US solar manufacturing industry, which has sought to bring online more capacity, particularly of wafers and cells, in recent months. T1 praised the Trump administration\u2019s \u201cpro-growth economic and trade policies\u201d, likely referring to the wave of tariffs placed on imported goods and investigations into imports from Chinese-backed firms in an effort to stimulate domestic manufacturing.<\/p>\n\n\n\n<p>This sentiment echoes comments made by T1 in July, when it said that the Department of Commerce\u2019s (DOC\u2019s) Section 232 investigation into polysilicon imports <a href=\"https:\/\/www.pv-tech.org\/t1-energy-tariffs-donald-trump-polysilicon-antidumping-solar-manufacturing\/\" target=\"_blank\" rel=\"noreferrer noopener\">\u201cwill result in strengthening US energy security and boosting American advanced manufacturing\u201d<\/a>, by determining how polysilicon imports to the US should be affected by tariffs and other trade policies.<\/p>\n\n\n\n<p>However, the lack of clarity on the Section 232 ruling has left many unanswered questions for the US solar manufacturing sector, particularly for polysilicon, as US module manufacturing capacity has grown much faster than polysilicon manufacturing capacity. <a href=\"https:\/\/www.pv-tech.org\/what-does-the-upcoming-section-232-on-polysilicon-need-to-answer\/\" target=\"_blank\" rel=\"noreferrer noopener\">Figures from Solar Media Market Research<\/a> show that, by the end of 2025, the US is expected to lack 18GW of domestic polysilicon manufacturing capacity to meet its annual module manufacturing capacity, creating a gap that would have to be plugged by foreign imports, exactly the kind of imports that would be targeted by a strict Section 232 ruling.<\/p>\n\n\n\n<p>For their part, T1\u2019s partners expressed optimism today that the deals put in place with the company would help deliver a robust US solar supply chain.<\/p>\n\n\n\n<p>\u201cCorning is proud to supply G2 Austin with wafers that will power the next chapter in American-made solar technology,\u201d said AB Ghosh, vice-president of solar at Corning, chairman and CEO of Hemlock Semiconductor.<\/p>\n\n\n\n<p>\u201cThis is exactly the kind of investment in technology we hope to see continue in the US,\u201d added Dan Shugar, founder and CEO of NEXTPower.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>T1 Energy has started construction on the 2.1GW first phase of its TOPCon cell manufacturing facility in Texas.<\/p>\n","protected":false},"author":165,"featured_media":163614,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[552,131,134,13142,104,428,79],"paywall-tags":[],"regions":[29],"industry-segments":[13,8],"class_list":["post-163613","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-cell-manufacturing","tag-cells","tag-manufacturing","tag-t1-energy","tag-texas","tag-topcon","tag-us","regions-americas","industry-segments-cell-processing","industry-segments-manufacturing"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>T1 Energy begins construction at 2.1GW Texas cell facility - PV Tech<\/title>\n<meta name=\"description\" content=\"T1 Energy has started construction on the 2.1GW first phase of its TOPCon cell manufacturing facility in Texas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"T1 Energy begins construction at 2.1GW TOPCon cell manufacturing facility in Texas\" \/>\n<meta property=\"og:description\" content=\"T1 Energy has started construction on the 2.1GW first phase of its TOPCon cell manufacturing facility in Texas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/\" \/>\n<meta property=\"og:site_name\" content=\"PV Tech\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-17T16:19:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-17T16:19:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1202\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"JP Casey\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@pv_tech\" \/>\n<meta name=\"twitter:site\" content=\"@pv_tech\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"JP Casey\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/\"},\"author\":{\"name\":\"JP Casey\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/921af8a93b03c77dd6a11a662f3453ee\"},\"headline\":\"T1 Energy begins construction at 2.1GW TOPCon cell manufacturing facility in Texas\",\"datePublished\":\"2025-12-17T16:19:43+00:00\",\"dateModified\":\"2025-12-17T16:19:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/\"},\"wordCount\":645,\"publisher\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg\",\"keywords\":[\"cell manufacturing\",\"cells\",\"manufacturing\",\"t1 energy\",\"texas\",\"topcon\",\"us\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/\",\"url\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/\",\"name\":\"T1 Energy begins construction at 2.1GW Texas cell facility - PV Tech\",\"isPartOf\":{\"@id\":\"https:\/\/www.pv-tech.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg\",\"datePublished\":\"2025-12-17T16:19:43+00:00\",\"dateModified\":\"2025-12-17T16:19:46+00:00\",\"description\":\"T1 Energy has started construction on the 2.1GW first phase of its TOPCon cell manufacturing facility in Texas.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#primaryimage\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg\",\"width\":1202,\"height\":800,\"caption\":\"Image: T1 Energy.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pv-tech.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"T1 Energy begins construction at 2.1GW TOPCon cell manufacturing facility in Texas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pv-tech.org\/#website\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"name\":\"PV Tech\",\"description\":\"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.\",\"publisher\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pv-tech.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pv-tech.org\/#organization\",\"name\":\"PV Tech\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"width\":437,\"height\":100,\"caption\":\"PV Tech\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\",\"https:\/\/x.com\/pv_tech\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/921af8a93b03c77dd6a11a662f3453ee\",\"name\":\"JP Casey\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/826c39b7070fbcbfd49576e755d7713b37f0a5136da4b3868f90df2c3e7e6257?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/826c39b7070fbcbfd49576e755d7713b37f0a5136da4b3868f90df2c3e7e6257?s=96&d=mm&r=g\",\"caption\":\"JP Casey\"},\"url\":\"https:\/\/www.pv-tech.org\/author\/jp-casey\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"T1 Energy begins construction at 2.1GW Texas cell facility - PV Tech","description":"T1 Energy has started construction on the 2.1GW first phase of its TOPCon cell manufacturing facility in Texas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/","og_locale":"en_US","og_type":"article","og_title":"T1 Energy begins construction at 2.1GW TOPCon cell manufacturing facility in Texas","og_description":"T1 Energy has started construction on the 2.1GW first phase of its TOPCon cell manufacturing facility in Texas.","og_url":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/","og_site_name":"PV Tech","article_publisher":"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","article_published_time":"2025-12-17T16:19:43+00:00","article_modified_time":"2025-12-17T16:19:46+00:00","og_image":[{"width":1202,"height":800,"url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg","type":"image\/jpeg"}],"author":"JP Casey","twitter_card":"summary_large_image","twitter_creator":"@pv_tech","twitter_site":"@pv_tech","twitter_misc":{"Written by":"JP Casey","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#article","isPartOf":{"@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/"},"author":{"name":"JP Casey","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/921af8a93b03c77dd6a11a662f3453ee"},"headline":"T1 Energy begins construction at 2.1GW TOPCon cell manufacturing facility in Texas","datePublished":"2025-12-17T16:19:43+00:00","dateModified":"2025-12-17T16:19:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/"},"wordCount":645,"publisher":{"@id":"https:\/\/www.pv-tech.org\/#organization"},"image":{"@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg","keywords":["cell manufacturing","cells","manufacturing","t1 energy","texas","topcon","us"],"articleSection":["News"],"inLanguage":"en-US","copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/www.pv-tech.org\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/","url":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/","name":"T1 Energy begins construction at 2.1GW Texas cell facility - PV Tech","isPartOf":{"@id":"https:\/\/www.pv-tech.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#primaryimage"},"image":{"@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg","datePublished":"2025-12-17T16:19:43+00:00","dateModified":"2025-12-17T16:19:46+00:00","description":"T1 Energy has started construction on the 2.1GW first phase of its TOPCon cell manufacturing facility in Texas.","breadcrumb":{"@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#primaryimage","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/12\/t1-energy.jpg","width":1202,"height":800,"caption":"Image: T1 Energy."},{"@type":"BreadcrumbList","@id":"https:\/\/www.pv-tech.org\/t1-energy-begins-construction-2-1gw-topcon-cell-manufacturing-facility-texas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pv-tech.org\/"},{"@type":"ListItem","position":2,"name":"T1 Energy begins construction at 2.1GW TOPCon cell manufacturing facility in Texas"}]},{"@type":"WebSite","@id":"https:\/\/www.pv-tech.org\/#website","url":"https:\/\/www.pv-tech.org\/","name":"PV Tech","description":"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.","publisher":{"@id":"https:\/\/www.pv-tech.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pv-tech.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pv-tech.org\/#organization","name":"PV Tech","url":"https:\/\/www.pv-tech.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","width":437,"height":100,"caption":"PV Tech"},"image":{"@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","https:\/\/x.com\/pv_tech"]},{"@type":"Person","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/921af8a93b03c77dd6a11a662f3453ee","name":"JP Casey","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/826c39b7070fbcbfd49576e755d7713b37f0a5136da4b3868f90df2c3e7e6257?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/826c39b7070fbcbfd49576e755d7713b37f0a5136da4b3868f90df2c3e7e6257?s=96&d=mm&r=g","caption":"JP Casey"},"url":"https:\/\/www.pv-tech.org\/author\/jp-casey\/"}]}},"_links":{"self":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/163613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/users\/165"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/comments?post=163613"}],"version-history":[{"count":2,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/163613\/revisions"}],"predecessor-version":[{"id":163628,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/163613\/revisions\/163628"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media\/163614"}],"wp:attachment":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media?parent=163613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/categories?post=163613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/tags?post=163613"},{"taxonomy":"paywall-tags","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/paywall-tags?post=163613"},{"taxonomy":"regions","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/regions?post=163613"},{"taxonomy":"industry-segments","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/industry-segments?post=163613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}