{"id":161054,"date":"2025-10-09T14:44:43","date_gmt":"2025-10-09T14:44:43","guid":{"rendered":"https:\/\/www.pv-tech.org\/?p=161054"},"modified":"2025-10-09T14:44:45","modified_gmt":"2025-10-09T14:44:45","slug":"entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre","status":"publish","type":"post","link":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/","title":{"rendered":"Entergy to build 600MW solar-plus-storage project in Arkansas to power Google data centre"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas-1024x682.jpg\" alt=\"Google and Entergy Arkansas announce the project.\" class=\"wp-image-161055\" srcset=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas-1024x682.jpg 1024w, https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas-300x200.jpg 300w, https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas-768x511.jpg 768w, https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg 1202w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">&#8216;Large customers, such as Google, help support investments in infrastructure additions,&#8217; said Laura Landreaux, second right. Image: Entergy Arkansas.<\/figcaption><\/figure>\n\n\n\n<p>US utility Entergy Arkansas has announced plans to build a 600MW solar-plus-storage project in the city of West Memphis to support the operations of a new data centre to be built by Google.<\/p>\n\n\n\n<p>The utility will build the new solar project, to be teamed with a 350MW battery energy storage system (BESS), in Jefferson County, Arkansas, which will meet the data centre\u2019s energy demand alongside existing Entergy facilities in the state. As of the end of 2024, the utility owned or operated 711MW of solar capacity, plus the 100MW Searcy solar project\u2014teamed with a 10MW BESS\u2014and 73MW of hydroelectric capacity.<\/p>\n\n\n\n<p>Last week\u2019s addition of the new solar capacity will significantly add to the utility\u2019s renewable energy output, and help rebalance an energy mix that is still reliant on fossil fuels; the utility currently operates 18.8GW of fossil fuel capacity across four US states. Entergy announced that it has filed for approval with the Arkansas Public Service Commission for the new project, and that Google will \u201cpay rates that cover the cost of this resource\u201d.<\/p>\n\n\n\n<p>\u201cLarge industrial and technology companies are increasingly looking at our state because we offer reliable power at affordable rates, and we plan to keep it that way,\u201d said Laura Landreaux, Entergy Arkansas president and CEO. \u201cLarge customers, such as Google, help support investments in infrastructure additions that not only help power their facilities but also result in improved grid reliability that benefit all customers.\u201d<\/p>\n\n\n\n<p>Our sister site <em>Energy-Storage.news <\/em>first reported on the project one month ago, after Entergy <a href=\"https:\/\/www.energy-storage.news\/arkansas-utility-seeks-approval-of-1-4gwh-hybrid-bess-with-financial-support-from-google-as-part-of-data-centre-deal\/\" target=\"_blank\" rel=\"noreferrer noopener\">revealed the project as part of a Certificate of Environmental Compatibility and Public Need (CECPN) application (Premium access article)<\/a>. <\/p>\n\n\n\n<p>Landreaux\u2019s comments come as technology giants\u2014so-called \u2018hyperscalers\u2019\u2014continue to make significant investments in the clean energy space, often to meet growing electricity demand for data centres. Last year, <a href=\"https:\/\/www.pv-tech.org\/brookfield-microsoft-ink-10-5gw-renewables-offtake-agreement\/\" target=\"_blank\" rel=\"noreferrer noopener\">Brookfield and Microsoft signed the largest offtake agreement on record<\/a>, covering 10.5GW of capacity, in the US and Europe, and this summer, <a href=\"https:\/\/www.pv-tech.org\/amazon-to-invest-au20-billion-in-australian-data-centres-powered-by-solar-pv\/\" target=\"_blank\" rel=\"noreferrer noopener\">Amazon announced plans to invest around US$13 billion in new data centres<\/a>, to be powered by solar projects, representing vast sums of money entering the renewable energy sector.<\/p>\n\n\n\n<p>Indeed, Google plans to invest US$4 billion in its new Arkansas data centre, and will cover all \u201cenergy costs\u201d associated with powering the facility. Entergy Arkansas also estimates that the facility will drive over US$1.1 billion in net benefits over the life of its contract with the technology giant, including a US$25 million Energy Impact Fund to scale and accelerate \u201cenergy affordability\u201d projects in the state.<\/p>\n\n\n\n<p>\u201cWe see AI and the energy powering it to be the innovations that will define this century. The upside of AI cannot be unlocked without the energy it requires,\u201d said Ruth Porat, president and chief investment officer of Google, whose comments follow the publication of research from the International Energy Agency (IEA) that <a href=\"https:\/\/www.pv-tech.org\/ai-data-centre-demand-to-more-than-double-by-2030\/\" target=\"_blank\" rel=\"noreferrer noopener\">energy demand from AI-driven data centres will more than double to 945TWh by the end of the decade<\/a>.<\/p>\n\n\n\n<p>\u201cThat is why Google is building energy capacity that protects affordability for ratepayers and creates jobs that will drive the AI-powered economy,\u201d&nbsp;added Porat.<\/p>\n","protected":false},"excerpt":{"rendered":"<p> Entergy Arkansas has announced plans to build a 600MW solar-plus-storage project to support a new data centre to be built by Google.<\/p>\n","protected":false},"author":165,"featured_media":161055,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[830,4059,5050,4060,105,1714,8700,720,79],"paywall-tags":[],"regions":[29],"industry-segments":[9,23,19],"class_list":["post-161054","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-americas","tag-arkansas","tag-data-centres","tag-entergy","tag-google","tag-projects","tag-solar-plus-storage-2","tag-storage","tag-us","regions-americas","industry-segments-power-plants","industry-segments-projects","industry-segments-storage"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Entergy 600MW solar-plus-storage project to power Google centre - PV Tech<\/title>\n<meta name=\"description\" content=\"Entergy Arkansas has announced plans to build a 600MW solar-plus-storage project to support a new data centre to be built by Google.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Entergy to build 600MW solar-plus-storage project in Arkansas to power Google data centre\" \/>\n<meta property=\"og:description\" content=\"Entergy Arkansas has announced plans to build a 600MW solar-plus-storage project to support a new data centre to be built by Google.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/\" \/>\n<meta property=\"og:site_name\" content=\"PV Tech\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-09T14:44:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-09T14:44:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1202\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"JP Casey\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@pv_tech\" \/>\n<meta name=\"twitter:site\" content=\"@pv_tech\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"JP Casey\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/\"},\"author\":{\"name\":\"JP Casey\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/921af8a93b03c77dd6a11a662f3453ee\"},\"headline\":\"Entergy to build 600MW solar-plus-storage project in Arkansas to power Google data centre\",\"datePublished\":\"2025-10-09T14:44:43+00:00\",\"dateModified\":\"2025-10-09T14:44:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/\"},\"wordCount\":550,\"publisher\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg\",\"keywords\":[\"americas\",\"arkansas\",\"data centres\",\"entergy\",\"google\",\"projects\",\"solar-plus-storage\",\"storage\",\"us\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/\",\"url\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/\",\"name\":\"Entergy 600MW solar-plus-storage project to power Google centre - PV Tech\",\"isPartOf\":{\"@id\":\"https:\/\/www.pv-tech.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg\",\"datePublished\":\"2025-10-09T14:44:43+00:00\",\"dateModified\":\"2025-10-09T14:44:45+00:00\",\"description\":\"Entergy Arkansas has announced plans to build a 600MW solar-plus-storage project to support a new data centre to be built by Google.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#primaryimage\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg\",\"width\":1202,\"height\":800,\"caption\":\"Image: Entergy Arkansas.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pv-tech.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Entergy to build 600MW solar-plus-storage project in Arkansas to power Google data centre\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pv-tech.org\/#website\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"name\":\"PV Tech\",\"description\":\"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.\",\"publisher\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pv-tech.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pv-tech.org\/#organization\",\"name\":\"PV Tech\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"width\":437,\"height\":100,\"caption\":\"PV Tech\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\",\"https:\/\/x.com\/pv_tech\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/921af8a93b03c77dd6a11a662f3453ee\",\"name\":\"JP Casey\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/826c39b7070fbcbfd49576e755d7713b37f0a5136da4b3868f90df2c3e7e6257?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/826c39b7070fbcbfd49576e755d7713b37f0a5136da4b3868f90df2c3e7e6257?s=96&d=mm&r=g\",\"caption\":\"JP Casey\"},\"url\":\"https:\/\/www.pv-tech.org\/author\/jp-casey\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Entergy 600MW solar-plus-storage project to power Google centre - PV Tech","description":"Entergy Arkansas has announced plans to build a 600MW solar-plus-storage project to support a new data centre to be built by Google.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/","og_locale":"en_US","og_type":"article","og_title":"Entergy to build 600MW solar-plus-storage project in Arkansas to power Google data centre","og_description":"Entergy Arkansas has announced plans to build a 600MW solar-plus-storage project to support a new data centre to be built by Google.","og_url":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/","og_site_name":"PV Tech","article_publisher":"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","article_published_time":"2025-10-09T14:44:43+00:00","article_modified_time":"2025-10-09T14:44:45+00:00","og_image":[{"width":1202,"height":800,"url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg","type":"image\/jpeg"}],"author":"JP Casey","twitter_card":"summary_large_image","twitter_creator":"@pv_tech","twitter_site":"@pv_tech","twitter_misc":{"Written by":"JP Casey","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#article","isPartOf":{"@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/"},"author":{"name":"JP Casey","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/921af8a93b03c77dd6a11a662f3453ee"},"headline":"Entergy to build 600MW solar-plus-storage project in Arkansas to power Google data centre","datePublished":"2025-10-09T14:44:43+00:00","dateModified":"2025-10-09T14:44:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/"},"wordCount":550,"publisher":{"@id":"https:\/\/www.pv-tech.org\/#organization"},"image":{"@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg","keywords":["americas","arkansas","data centres","entergy","google","projects","solar-plus-storage","storage","us"],"articleSection":["News"],"inLanguage":"en-US","copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/www.pv-tech.org\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/","url":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/","name":"Entergy 600MW solar-plus-storage project to power Google centre - PV Tech","isPartOf":{"@id":"https:\/\/www.pv-tech.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#primaryimage"},"image":{"@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg","datePublished":"2025-10-09T14:44:43+00:00","dateModified":"2025-10-09T14:44:45+00:00","description":"Entergy Arkansas has announced plans to build a 600MW solar-plus-storage project to support a new data centre to be built by Google.","breadcrumb":{"@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#primaryimage","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2025\/10\/entergy-arkansas.jpg","width":1202,"height":800,"caption":"Image: Entergy Arkansas."},{"@type":"BreadcrumbList","@id":"https:\/\/www.pv-tech.org\/entergy-600mw-solar-plus-storage-project-arkansas-power-google-data-centre\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pv-tech.org\/"},{"@type":"ListItem","position":2,"name":"Entergy to build 600MW solar-plus-storage project in Arkansas to power Google data centre"}]},{"@type":"WebSite","@id":"https:\/\/www.pv-tech.org\/#website","url":"https:\/\/www.pv-tech.org\/","name":"PV Tech","description":"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.","publisher":{"@id":"https:\/\/www.pv-tech.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pv-tech.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pv-tech.org\/#organization","name":"PV Tech","url":"https:\/\/www.pv-tech.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","width":437,"height":100,"caption":"PV Tech"},"image":{"@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","https:\/\/x.com\/pv_tech"]},{"@type":"Person","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/921af8a93b03c77dd6a11a662f3453ee","name":"JP Casey","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/826c39b7070fbcbfd49576e755d7713b37f0a5136da4b3868f90df2c3e7e6257?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/826c39b7070fbcbfd49576e755d7713b37f0a5136da4b3868f90df2c3e7e6257?s=96&d=mm&r=g","caption":"JP Casey"},"url":"https:\/\/www.pv-tech.org\/author\/jp-casey\/"}]}},"_links":{"self":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/161054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/users\/165"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/comments?post=161054"}],"version-history":[{"count":3,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/161054\/revisions"}],"predecessor-version":[{"id":161065,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/161054\/revisions\/161065"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media\/161055"}],"wp:attachment":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media?parent=161054"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/categories?post=161054"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/tags?post=161054"},{"taxonomy":"paywall-tags","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/paywall-tags?post=161054"},{"taxonomy":"regions","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/regions?post=161054"},{"taxonomy":"industry-segments","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/industry-segments?post=161054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}