{"id":159557,"date":"2025-09-04T11:47:23","date_gmt":"2025-09-04T11:47:23","guid":{"rendered":"https:\/\/www.pv-tech.org\/?p=159557"},"modified":"2025-09-04T11:47:25","modified_gmt":"2025-09-04T11:47:25","slug":"highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026","status":"publish","type":"post","link":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/","title":{"rendered":"Highland Materials to begin polysilicon plant construction in H2 2026"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"957\" height=\"669\" src=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg\" alt=\"highland materials manufacturing\" class=\"wp-image-135823\" srcset=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg 957w, https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547-300x210.jpg 300w, https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547-768x537.jpg 768w\" sizes=\"(max-width: 957px) 100vw, 957px\" \/><figcaption class=\"wp-element-caption\">Commercial operations of the 16,000MT polysilicon plant are expected in late 2027 or very early 2028. Image: Highland Materials<\/figcaption><\/figure>\n\n\n\n<p>US polysilicon company Highland Materials has aimed to begin construction at its polysilicon plant in the second half of 2026.<\/p>\n\n\n\n<p>Richard Rast, CEO at Highland Materials, told PV Tech that this would be followed by reaching a commercial operation date in late 2027 or very early 2028.<\/p>\n\n\n\n<p>The company recently <a href=\"https:\/\/www.pv-tech.org\/highland-materials-leases-former-nuclear-site-for-tennessee-polysilicon-plant\/\" target=\"_blank\" rel=\"noreferrer noopener\">secured 140 acres of land at the former Phipps Bend nuclear plant<\/a> in northeast Tennessee. The project aims to build a plant with an initial 16,000MT annual nameplate capacity, with the goal of expanding to 20,000MT in four years.&nbsp;This follows the company <a href=\"https:\/\/www.pv-tech.org\/highland-materials-us255-6-million-48c-tax-credit-to-build-polysilicon-plant\/\">securing US$255.6 million in 48C tax credits<\/a> in April 2024 for the construction of a polysilicon plant in the US.<\/p>\n\n\n\n<p>\u201cFortunately for us, the equipment is predominantly coming from the United States, so the issues that are happening now in the trade world probably will not affect us very much. As far as our ability to complete the construction, we have costs that are set and we&#8217;re essentially prepared to move into final design and begin construction,\u201d added Rast.<\/p>\n\n\n\n<p>Rast spoke with <em><a href=\"https:\/\/www.pv-tech.org\/innovation-allows-us-to-compete-straight-up-against-china-on-polysilicon\/\">PV Tech Premium<\/a><\/em> (subscription required) about polysilicon innovation and how the company\u2019s proprietary technology aims to compete with the Siemens process and bring more US-made capacity in an industry dominated by Chinese companies.<\/p>\n\n\n\n<p>The interview is part of an ongoing series of conversations with speakers from the upcoming <a href=\"https:\/\/www.pvtechconferences.com\/pv-celltech-usa\/\" target=\"_blank\" rel=\"noreferrer noopener\">PV CellTech USA Conference,<\/a> which will be held on 7-8 October 2025, in San Francisco. More details regarding the event and how to attend <a href=\"https:\/\/www.pvtechconferences.com\/pv-celltech-usa\/\" target=\"_blank\" rel=\"noreferrer noopener\">can be accessed here<\/a>. Previous and upcoming interviews <a href=\"https:\/\/www.pv-tech.org\/tag\/celltechusa\/\" target=\"_blank\" rel=\"noreferrer noopener\">will be available here<\/a> (a subscription is required to read Premium articles) and will cover the entire US manufacturing supply chain from polysilicon to modules.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>US polysilicon company Highland Materials has aimed to begin construction at its polysilicon plant in the second half of 2026.<\/p>\n","protected":false},"author":158,"featured_media":135823,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[11014,12300,132,86,79],"paywall-tags":[],"regions":[29],"industry-segments":[8,12],"class_list":["post-159557","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-celltechusa","tag-highland-materials","tag-polysilicon","tag-solar-manufacturing","tag-us","regions-americas","industry-segments-manufacturing","industry-segments-materials"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Highland Materials to begin polysilicon plant construction in H2 2026 - PV Tech<\/title>\n<meta name=\"description\" content=\"US polysilicon company Highland Materials has aimed to begin construction at its polysilicon plant in the second half of 2026.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Highland Materials to begin polysilicon plant construction in H2 2026\" \/>\n<meta property=\"og:description\" content=\"US polysilicon company Highland Materials has aimed to begin construction at its polysilicon plant in the second half of 2026.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"PV Tech\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-04T11:47:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-04T11:47:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"957\" \/>\n\t<meta property=\"og:image:height\" content=\"669\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jonathan Touri\u00f1o Jacobo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@pv_tech\" \/>\n<meta name=\"twitter:site\" content=\"@pv_tech\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jonathan Touri\u00f1o Jacobo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/\"},\"author\":{\"name\":\"Jonathan Touri\u00f1o Jacobo\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/42a77d0eab94f3f47995150f321baf58\"},\"headline\":\"Highland Materials to begin polysilicon plant construction in H2 2026\",\"datePublished\":\"2025-09-04T11:47:23+00:00\",\"dateModified\":\"2025-09-04T11:47:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/\"},\"wordCount\":303,\"publisher\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg\",\"keywords\":[\"celltechusa\",\"highland materials\",\"polysilicon\",\"solar manufacturing\",\"us\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/\",\"url\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/\",\"name\":\"Highland Materials to begin polysilicon plant construction in H2 2026 - PV Tech\",\"isPartOf\":{\"@id\":\"https:\/\/www.pv-tech.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg\",\"datePublished\":\"2025-09-04T11:47:23+00:00\",\"dateModified\":\"2025-09-04T11:47:25+00:00\",\"description\":\"US polysilicon company Highland Materials has aimed to begin construction at its polysilicon plant in the second half of 2026.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#primaryimage\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg\",\"width\":957,\"height\":669,\"caption\":\"Image: Highland Materials\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pv-tech.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Highland Materials to begin polysilicon plant construction in H2 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pv-tech.org\/#website\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"name\":\"PV Tech\",\"description\":\"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.\",\"publisher\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pv-tech.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pv-tech.org\/#organization\",\"name\":\"PV Tech\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"width\":437,\"height\":100,\"caption\":\"PV Tech\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\",\"https:\/\/x.com\/pv_tech\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/42a77d0eab94f3f47995150f321baf58\",\"name\":\"Jonathan Touri\u00f1o Jacobo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/300d9efdd62c409718bc40d571162efff8ef716c90d94fe761f5293f46e17144?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/300d9efdd62c409718bc40d571162efff8ef716c90d94fe761f5293f46e17144?s=96&d=mm&r=g\",\"caption\":\"Jonathan Touri\u00f1o Jacobo\"},\"url\":\"https:\/\/www.pv-tech.org\/author\/jonathan-tourinojacobo\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Highland Materials to begin polysilicon plant construction in H2 2026 - PV Tech","description":"US polysilicon company Highland Materials has aimed to begin construction at its polysilicon plant in the second half of 2026.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/","og_locale":"en_US","og_type":"article","og_title":"Highland Materials to begin polysilicon plant construction in H2 2026","og_description":"US polysilicon company Highland Materials has aimed to begin construction at its polysilicon plant in the second half of 2026.","og_url":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/","og_site_name":"PV Tech","article_publisher":"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","article_published_time":"2025-09-04T11:47:23+00:00","article_modified_time":"2025-09-04T11:47:25+00:00","og_image":[{"width":957,"height":669,"url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg","type":"image\/jpeg"}],"author":"Jonathan Touri\u00f1o Jacobo","twitter_card":"summary_large_image","twitter_creator":"@pv_tech","twitter_site":"@pv_tech","twitter_misc":{"Written by":"Jonathan Touri\u00f1o Jacobo","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#article","isPartOf":{"@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/"},"author":{"name":"Jonathan Touri\u00f1o Jacobo","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/42a77d0eab94f3f47995150f321baf58"},"headline":"Highland Materials to begin polysilicon plant construction in H2 2026","datePublished":"2025-09-04T11:47:23+00:00","dateModified":"2025-09-04T11:47:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/"},"wordCount":303,"publisher":{"@id":"https:\/\/www.pv-tech.org\/#organization"},"image":{"@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg","keywords":["celltechusa","highland materials","polysilicon","solar manufacturing","us"],"articleSection":["News"],"inLanguage":"en-US","copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/www.pv-tech.org\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/","url":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/","name":"Highland Materials to begin polysilicon plant construction in H2 2026 - PV Tech","isPartOf":{"@id":"https:\/\/www.pv-tech.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#primaryimage"},"image":{"@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg","datePublished":"2025-09-04T11:47:23+00:00","dateModified":"2025-09-04T11:47:25+00:00","description":"US polysilicon company Highland Materials has aimed to begin construction at its polysilicon plant in the second half of 2026.","breadcrumb":{"@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#primaryimage","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/highland-materials-manufacturing-1-e1715074565547.jpg","width":957,"height":669,"caption":"Image: Highland Materials"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pv-tech.org\/highland-materials-to-begin-polysilicon-plant-construction-in-h2-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pv-tech.org\/"},{"@type":"ListItem","position":2,"name":"Highland Materials to begin polysilicon plant construction in H2 2026"}]},{"@type":"WebSite","@id":"https:\/\/www.pv-tech.org\/#website","url":"https:\/\/www.pv-tech.org\/","name":"PV Tech","description":"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.","publisher":{"@id":"https:\/\/www.pv-tech.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pv-tech.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pv-tech.org\/#organization","name":"PV Tech","url":"https:\/\/www.pv-tech.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","width":437,"height":100,"caption":"PV Tech"},"image":{"@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","https:\/\/x.com\/pv_tech"]},{"@type":"Person","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/42a77d0eab94f3f47995150f321baf58","name":"Jonathan Touri\u00f1o Jacobo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/300d9efdd62c409718bc40d571162efff8ef716c90d94fe761f5293f46e17144?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/300d9efdd62c409718bc40d571162efff8ef716c90d94fe761f5293f46e17144?s=96&d=mm&r=g","caption":"Jonathan Touri\u00f1o Jacobo"},"url":"https:\/\/www.pv-tech.org\/author\/jonathan-tourinojacobo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/159557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/users\/158"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/comments?post=159557"}],"version-history":[{"count":2,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/159557\/revisions"}],"predecessor-version":[{"id":159572,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/posts\/159557\/revisions\/159572"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media\/135823"}],"wp:attachment":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media?parent=159557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/categories?post=159557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/tags?post=159557"},{"taxonomy":"paywall-tags","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/paywall-tags?post=159557"},{"taxonomy":"regions","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/regions?post=159557"},{"taxonomy":"industry-segments","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/industry-segments?post=159557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}