{"id":12518,"date":"2008-08-01T00:00:00","date_gmt":"2008-08-01T00:00:00","guid":{"rendered":"https:\/\/v4.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/"},"modified":"2023-07-29T10:25:38","modified_gmt":"2023-07-29T10:25:38","slug":"challenges-of-the-gigawatt-fab","status":"publish","type":"technical-papers","link":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/","title":{"rendered":"Challenges of the gigawatt fab"},"content":{"rendered":"<p>By Michael Kostwald, Senior Cosultant,Turner &#038; Townsend GmbH; Hans Mahrenholtz, Head of Application Development, Linde Gas, Linde Ag; Anish Tolia, Market Development Manager, Linde Electronics<\/p>\n<p>Thin&#45;film solar cell manufacturing is poised to make a giant leap in scale with the birth of the gigawatt fab. Commercial thin&#45;film plants are typically sized based on the capacity of the production line from the chosen equipment supplier. In most cases, initial investments have been for a single line, typically with an output capacity of no more than 60MWp. This period of initial development has allowed the industry to prove the robustness of the technology and capabilities of the equipment, as well as to understand the significance for the cost&#45;per&#45;watt of key cost drivers such as materials reduction, cell efficiency increases, and productivity. While large&#45;scale manufacturing will positively impact costs, it presents a unique set of challenges for equipment and material suppliers, as well as the engineering and contracting companies tasked with designing, building, equipping and running a facility on this scale. In this paper, we present the insights of two specialty companies in the solar industry. Turner and Townsend, a design and project management consultancy, and Linde, glass manufacturer and gas and chemical company &#45; share their views of the challenges of the gigawatt fab in three dedicated sections.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Thin&#45;film solar cell manufacturing is poised to make a giant leap in scale with the birth of the gigawatt fab. Commercial thin&#45;film plants are typically sized based on the capacity of the production line from the chosen equipment supplier. In most cases, initial investments have been for a single line, typically with an output capacity of no more than 60MWp. This period of initial development has allowed the industry to prove the robustness of the technology and capabilities of the equipment, as well as to understand the significance for the cost&#45;per&#45;watt of key cost drivers such as materials reduction, cell efficiency increases, and productivity. While large&#45;scale manufacturing will positively impact costs, it presents a unique set of challenges for equipment and material suppliers, as well as the engineering and contracting companies tasked with designing, building, equipping and running a facility on this scale. In this paper, we present the insights of two specialty companies in the solar industry. Turner and Townsend, a design and project management consultancy, and Linde, glass manufacturer and gas and chemical company &#45; share their views of the challenges of the gigawatt fab in three dedicated sections.<\/p>\n","protected":false},"author":1,"featured_media":28823,"template":"","paywall-tags":[8671],"technical-papers-categories":[2931,2921],"class_list":["post-12518","technical-papers","type-technical-papers","status-publish","has-post-thumbnail","hentry","paywall-tags-premium","technical-papers-categories-materials","technical-papers-categories-photovoltaics-international-papers"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Challenges of the gigawatt fab - PV Tech<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Challenges of the gigawatt fab\" \/>\n<meta property=\"og:description\" content=\"Thin&#045;film solar cell manufacturing is poised to make a giant leap in scale with the birth of the gigawatt fab. Commercial thin&#045;film plants are typically sized based on the capacity of the production line from the chosen equipment supplier. In most cases, initial investments have been for a single line, typically with an output capacity of no more than 60MWp. This period of initial development has allowed the industry to prove the robustness of the technology and capabilities of the equipment, as well as to understand the significance for the cost&#045;per&#045;watt of key cost drivers such as materials reduction, cell efficiency increases, and productivity. While large&#045;scale manufacturing will positively impact costs, it presents a unique set of challenges for equipment and material suppliers, as well as the engineering and contracting companies tasked with designing, building, equipping and running a facility on this scale. In this paper, we present the insights of two specialty companies in the solar industry. Turner and Townsend, a design and project management consultancy, and Linde, glass manufacturer and gas and chemical company &#045; share their views of the challenges of the gigawatt fab in three dedicated sections.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/\" \/>\n<meta property=\"og:site_name\" content=\"PV Tech\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-29T10:25:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/12\/f400_installation_cropped.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"226\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@pv_tech\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/\",\"url\":\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/\",\"name\":\"Challenges of the gigawatt fab - PV Tech\",\"isPartOf\":{\"@id\":\"https:\/\/www.pv-tech.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/12\/f400_installation_cropped.jpg\",\"datePublished\":\"2008-08-01T00:00:00+00:00\",\"dateModified\":\"2023-07-29T10:25:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#primaryimage\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/12\/f400_installation_cropped.jpg\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/12\/f400_installation_cropped.jpg\",\"width\":400,\"height\":226},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pv-tech.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Technical Papers\",\"item\":\"https:\/\/www.pv-tech.org\/technical-papers\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Challenges of the gigawatt fab\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pv-tech.org\/#website\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"name\":\"PV Tech\",\"description\":\"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.\",\"publisher\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pv-tech.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pv-tech.org\/#organization\",\"name\":\"PV Tech\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"width\":437,\"height\":100,\"caption\":\"PV Tech\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\",\"https:\/\/x.com\/pv_tech\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Challenges of the gigawatt fab - PV Tech","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/","og_locale":"en_US","og_type":"article","og_title":"Challenges of the gigawatt fab","og_description":"Thin&#45;film solar cell manufacturing is poised to make a giant leap in scale with the birth of the gigawatt fab. Commercial thin&#45;film plants are typically sized based on the capacity of the production line from the chosen equipment supplier. In most cases, initial investments have been for a single line, typically with an output capacity of no more than 60MWp. This period of initial development has allowed the industry to prove the robustness of the technology and capabilities of the equipment, as well as to understand the significance for the cost&#45;per&#45;watt of key cost drivers such as materials reduction, cell efficiency increases, and productivity. While large&#45;scale manufacturing will positively impact costs, it presents a unique set of challenges for equipment and material suppliers, as well as the engineering and contracting companies tasked with designing, building, equipping and running a facility on this scale. In this paper, we present the insights of two specialty companies in the solar industry. Turner and Townsend, a design and project management consultancy, and Linde, glass manufacturer and gas and chemical company &#45; share their views of the challenges of the gigawatt fab in three dedicated sections.","og_url":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/","og_site_name":"PV Tech","article_publisher":"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","article_modified_time":"2023-07-29T10:25:38+00:00","og_image":[{"width":400,"height":226,"url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/12\/f400_installation_cropped.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@pv_tech","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/","url":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/","name":"Challenges of the gigawatt fab - PV Tech","isPartOf":{"@id":"https:\/\/www.pv-tech.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#primaryimage"},"image":{"@id":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/12\/f400_installation_cropped.jpg","datePublished":"2008-08-01T00:00:00+00:00","dateModified":"2023-07-29T10:25:38+00:00","breadcrumb":{"@id":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#primaryimage","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/12\/f400_installation_cropped.jpg","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/12\/f400_installation_cropped.jpg","width":400,"height":226},{"@type":"BreadcrumbList","@id":"https:\/\/www.pv-tech.org\/technical-papers\/challenges-of-the-gigawatt-fab\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pv-tech.org\/"},{"@type":"ListItem","position":2,"name":"Technical Papers","item":"https:\/\/www.pv-tech.org\/technical-papers\/"},{"@type":"ListItem","position":3,"name":"Challenges of the gigawatt fab"}]},{"@type":"WebSite","@id":"https:\/\/www.pv-tech.org\/#website","url":"https:\/\/www.pv-tech.org\/","name":"PV Tech","description":"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.","publisher":{"@id":"https:\/\/www.pv-tech.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pv-tech.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pv-tech.org\/#organization","name":"PV Tech","url":"https:\/\/www.pv-tech.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","width":437,"height":100,"caption":"PV Tech"},"image":{"@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","https:\/\/x.com\/pv_tech"]}]}},"_links":{"self":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers\/12518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers"}],"about":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/types\/technical-papers"}],"author":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers\/12518\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media\/28823"}],"wp:attachment":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media?parent=12518"}],"wp:term":[{"taxonomy":"paywall-tags","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/paywall-tags?post=12518"},{"taxonomy":"technical-papers-categories","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers-categories?post=12518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}